8
The TPFDD specified date when the unit will be ready to load on an aircraft or ship at the POE is the: Available-to-load date (ALD).
Added 6/20/2015 2:12:43 PM
This answer has been confirmed as correct and helpful.
Confirmed by
Andrew. [6/20/2015 6:04:38 PM]