Question and answer
A term used to indicate a good match between the technology utilized and the resources required for its optimal use a) New technology b) Emerging technology c) Appropriate technology d) Codified
technology
A term used to indicate a good match between the technology utilized and the resources required for its optimal use : c) Appropriate technology.
blizzgalll|Points 30|
Question
Asked 8/2/2013 7:39:48 AM
Updated 103 days ago|5/17/2014 9:43:01 AM
0 Answers/Comments
This conversation has been confirmed as correct, not copied, and helpful.
Confirmed by selymi [5/17/2014 9:43:01 AM]
Get an answer
New answers
Rating

There are no new answers.

Comments

There are no comments.

Add an answer or comment
Log in or sign up first.
Questions asked by the same visitor
All of the following are determinants of productivity except a) Effective control over cost and quality b) Rationalization of work flow c) Training hours spent on staff d) Optimal scheduling of work and material handling
Weegy: All of the following are determinants of productivity except Effective control over cost and quality (More)
Question
Expert Answered
Asked 8/2/2013 7:01:19 AM
0 Answers/Comments
All of the following are determinants of productivity except a) Effective control over cost and quality b) Rationalization of work flow c) Training hours spent on staff d) Optimal scheduling of work and material handling
Question
Not Answered
Updated 8/2/2013 7:17:02 AM
1 Answer/Comment
Determinants of productivity include: a) Effective control over cost and quality; b) Rationalization of work flow; and d) Optimal scheduling of work and material handling. c) Training hours spent on staff is not in itself a determinant of productivity.

Added 8/2/2013 7:17:02 AM
All of the following are determinants of productivity except a) Effective control over cost and quality b) Rationalization of work flow c) Training hours spent on staff d) Optimal scheduling of work and material handling
Weegy: c) Training hours spent on staff is not a determinant of productivity (More)
Question
Expert Answered
Updated 8/2/2013 7:18:54 AM
1 Answer/Comment
bibiolay17, please ensure that you always provide a link to a source which verifies your answer.
Added 8/2/2013 7:18:54 AM
All of the following are determinants of productivity except a) Effective control over cost and quality b) Rationalization of work flow c) Training hours spent on staff d) Optimal scheduling of work and material handling
Weegy: All of the following are determinants of productivity except a) Effective control over cost and quality (More)
Question
Expert Answered
Updated 8/3/2013 2:08:34 PM
6 Answers/Comments
Janet, you can flag two conversations if they contain two different answers. You may also ask the expert to provide a source so to verify the correct answer so that one of them will be unflagged. Otherwise, it should remain flagged.
Added 8/2/2013 8:03:15 AM
Thank you Andrew, I'll adopt that method in future.
Added 8/2/2013 10:38:07 AM
The determinat of productuvity are mostly the factors of production, these factors of production are: land, labour, capital and management. When any of this is lacking productivity will be less but when all this factors are available productivity will increase
Added 8/3/2013 11:31:29 AM
The determinat of productuvity are mostly the factors of production, these factors of production are: land, labour, capital and management. When any of this is lacking productivity will be less but when all this factors are available productivity will increase
Added 8/3/2013 11:33:46 AM
The training hours spent on staff has nothing to do with productivity, what matters is the skill aquired by the staff and his/her williness to work.
Added 8/3/2013 2:08:34 PM
17,168,859 questions answered
Popular Conversations
what is the mode of 3, 7, 9, 2, 5, 3, 4, 6, 1, 0 User: {3, 7, 9, 2, ...
Weegy: I assume you mean divided by and the answer would be 1 User: {3, 7, 9, 2, 5, 3, 4, 6, 1, 0} the mode of these ...
8/28/2014 10:48:20 AM| 3 Answers
x/8-6>2
8/28/2014 2:19:03 PM| 3 Answers
Control programs are also known as
8/28/2014 2:34:02 AM| 2 Answers
Which individual or entity is responsible for conducting long-range ...
Weegy: Logistics section is responsible for conducting long-range and/or contingency planning. ........... User: ...
8/28/2014 6:22:01 AM| 2 Answers
My Section supports the incident response by overseeing contracting ...
Weegy: Answer: Logistics section Chief
8/28/2014 6:22:50 AM| 2 Answers
4(x-7)=2
Weegy: x - 2 = 7 x = 7 + 2 x = 9 User: 4t-13=57
8/28/2014 7:05:07 AM| 2 Answers
14 · (4 + 3)-1
8/28/2014 10:27:42 AM| 2 Answers
The symbol for the hydronium ion is _____. H+ H3O- H3O+ OH-
Weegy: The symbol for the hydroxide ion is OH- .
8/28/2014 11:35:15 AM| 2 Answers
the largest consumers of water
8/28/2014 12:55:58 PM| 2 Answers
Weegy Stuff
S
R
L
1
1
P
C
1
P
1
1
L
P
C
P
C
1
P
C
L
P
C
1
P
C
P
C
Points 2528 [Total 24128]| Ratings 4| Comments 2488| Invitations 0|Offline
S
L
1
L
Points 2108 [Total 6084]| Ratings 8| Comments 2028| Invitations 0|Offline
S
L
C
P
C
1
L
L
Points 2014 [Total 15628]| Ratings 11| Comments 1904| Invitations 0|Offline
S
L
P
C
L
P
C
P
C
L
P
C
P
C
P
C
Points 1939 [Total 16966]| Ratings 6| Comments 1879| Invitations 0|Offline
S
L
1
1
1
1
L
1
Points 1843 [Total 9550]| Ratings 2| Comments 1823| Invitations 0|Offline
S
L
P
C
P
C
1
L
P
C
L
P
C
P
C
P
C
P
C
Points 899 [Total 18470]| Ratings 0| Comments 899| Invitations 0|Offline
S
1
L
L
Points 548 [Total 5112]| Ratings 0| Comments 548| Invitations 0|Offline
S
1
L
1
L
P
P
L
Points 543 [Total 11204]| Ratings 1| Comments 533| Invitations 0|Offline
S
Points 374 [Total 577]| Ratings 1| Comments 364| Invitations 0|Offline
S
Points 366 [Total 366]| Ratings 2| Comments 316| Invitations 3|Offline
Home | Contact | Blog | About | Terms | Privacy | Social | ©2014 Purple Inc.