Q: A project has three paths. A–B–C has a length of 25 days. A–D–C has a length of 15 days. Finally, A–E–C has a length of 20 days. Which one of the following statements is TRUE? A. A–D–C is the
critical path. B. The expected duration of this project is 25 days. C. A–B–C has the most slack. D. The expected duration of this project is 25 + 15 + 20 = 60 days.
A: B. The expected duration of this project is 25 days.
Get an answer
Original conversation
User: A project has three paths. A–B–C has a length of 25 days. A–D–C has a length of 15 days. Finally, A–E–C has a length of 20 days. Which one of the following statements is TRUE? A. A–D–C is the critical path. B. The expected duration of this project is 25 days. C. A–B–C has the most slack. D. The expected duration of this project is 25 + 15 + 20 = 60 days.

Weegy: B. The expected duration of this project is 25 days.
indica20|Points 20|

User: A computer analysis reveals that the best-fitting trend model is Yt = 4.12 e 0.987 t. The trend was fitted using year-end common stock prices for Melodic Kortholt Outlet for the last six years. The R2 is 0.8571. If we fit a linear trend to data that are growing exponentially __________. A. the stock's true intrinsic value is $4.12 B. few investments could match the astounding growth rate C. at the end of year 3 the stock price would be nearly $80 D. the absolute annual growth (in dollars per share) is increasing

Question
Asked 11/21/2012 2:05:11 PM
0 Answers/Comments
New answers
Rating

There are no new answers.

Comments

There are no comments.

Add an answer or comment
Log in or sign up first.
26,923,194 questions answered
*
Get answers from Weegy and a team of really smart lives experts.
Popular Conversations
6 + (2 + 3) × 5?
Weegy: 2*6+4*5, 12 + 20 = 32 User: 2(5 × 3) + 2(5 × 8) + 2(3 × 8) Weegy: 3/8+2/5 = 15/40+16/40 = 31/40 User: ...
5/22/2018 9:36:32 AM| 2 Answers
Strike-slip fault
Weegy: In a strike-slip fault, the rocks on either side of the fault slip past each other sideways. TRUE.
5/17/2018 3:51:47 PM| 2 Answers
Which is not a responsibility of the president
5/18/2018 10:17:31 PM| 2 Answers
After the skin is cut and a capillary wall breaks, what's the first ...
Weegy: After the skin is cut and a capillary wall breaks, the first step in working to form a clot is - Platelets clump ...
5/23/2018 5:14:16 PM| 2 Answers
Adverb clauses modify __________.
Weegy: An adverb clause is a dependent clause that acts as an adverb. User: Which sentence correctly forms the ...
5/19/2018 2:53:57 PM| 2 Answers
What does velocity mean
5/23/2018 7:13:12 PM| 2 Answers
S
L
Points 226 [Total 237] Ratings 0 Comments 226 Invitations 0 Offline
S
R
L
R
P
R
Points 216 [Total 658] Ratings 0 Comments 26 Invitations 19 Offline
S
L
Points 141 [Total 141] Ratings 0 Comments 21 Invitations 12 Offline
S
1
L
L
P
R
P
L
P
P
R
P
R
P
R
P
Points 124 [Total 13209] Ratings 0 Comments 114 Invitations 1 Offline
S
Points 30 [Total 30] Ratings 0 Comments 0 Invitations 3 Offline
S
Points 14 [Total 14] Ratings 0 Comments 14 Invitations 0 Offline
S
Points 13 [Total 13] Ratings 0 Comments 3 Invitations 1 Offline
S
Points 13 [Total 13] Ratings 0 Comments 13 Invitations 0 Offline
S
Points 11 [Total 11] Ratings 1 Comments 1 Invitations 0 Offline
S
L
1
R
Points 11 [Total 1416] Ratings 0 Comments 1 Invitations 1 Offline
* Excludes moderators and previous
winners (Include)
Home | Contact | Blog | About | Terms | Privacy | © Purple Inc.