How may the design of the facility affect both construction and long-term operating costs?
nitial costs may include capital investment costs for land acquisition, construction, [ or renovation and for the equipment needed to operate a facility. Land acquisition costs need to be included in the initial cost estimate if they differ among design alternatives. This would be the case, for example, when comparing the cost of renovating an existing facility with new construction on
purchased land. Construction costs: Detailed estimates of construction costs are not necessary for preliminary economic analyses of alternative building designs or systems. Such estimates are usually not available until the design is quite advanced and the opportunity for cost-reducing design changes has been missed. ]
Expert answered|cham718|Points 160|
Question
Asked 8/2/2012 4:08:20 AM
0 Answers/Comments
Get an answer
New answers
Rating

There are no new answers.

Comments

There are no comments.

Add an answer or comment
Log in or sign up first.
25,942,525 questions answered
Popular Conversations
Simplify 8(x + 3) - 2x 6x + 3 7x 6x + 24 User: Simplify 8(x + 3) - ...
Weegy: What would you like to know about the number 24?
8/25/2016 1:13:10 PM| 2 Answers
What is medicare?
8/25/2016 12:19:47 AM| 1 Answers
Find the product. 3(m n)
8/25/2016 12:35:37 AM| 1 Answers
The Babylonians in Sumer used what as a monetary commodity? A.Yen ...
Weegy: The Babylonians in Sumer used Shekel as a monetary commodity
8/25/2016 12:36:09 AM| 1 Answers
Weegy Stuff
S
Points 670 [Total 741] Ratings 4 Comments 630 Invitations 0 Offline
S
1
L
Points 556 [Total 1390] Ratings 3 Comments 526 Invitations 0 Offline
S
L
P
P
P
P
Points 481 [Total 3736] Ratings 0 Comments 481 Invitations 0 Offline
S
Points 107 [Total 107] Ratings 0 Comments 107 Invitations 0 Offline
S
Points 58 [Total 285] Ratings 0 Comments 58 Invitations 0 Offline
S
L
P
P
P
Points 46 [Total 3862] Ratings 0 Comments 46 Invitations 0 Offline
S
Points 40 [Total 45] Ratings 0 Comments 0 Invitations 4 Offline
S
Points 15 [Total 15] Ratings 0 Comments 5 Invitations 1 Offline
S
L
C
Points 11 [Total 4491] Ratings 1 Comments 1 Invitations 0 Offline
S
Points 10 [Total 10] Ratings 1 Comments 0 Invitations 0 Offline
* Excludes moderators and previous
winners (Include)
Home | Contact | Blog | About | Terms | Privacy | © Purple Inc.